Sunday, March 7, 2010
New terminal for Hogtown airport
Pictured is the old terminal at Billy Bishop City Centre Airport in Toronto, taken from a new angle out of the window of the new terminal, which went live today. Like with all changes something is lost and something gained. The new terminal was very busy on our visit and we look forward to the building of the pedestrian tunnel, which should smooth out the flow of passenger arrivals and departures. I suggest they should name the tunnel in honour of departing Mayor Miller, as in Custer's last stand, a fitting monument to his greatest political defeat (not counting the dustbin strike).
Subscribe to:
Post Comments (Atom)
Uphill Battle Tour
For their autumn tour Jack and Richard chose two Moulton bicycles to ride from near Oswestry, Shropshire to Lewes in Sussex. Rupert to join ...
-
It has not been a good week for Toronto's "large imperfect" Mayor, David Miller. He has been booted off the Metrolinx Board by...
-
Matthew Marsh grabbed pole position for the Porsche Carrera Cup Asia race to be held here in Macau on Sunday. Marsh set a time of 2 minutes ...
-
The new edition of Tree News is out and I was lucky enough to receive a complementary copy from the editor John May. If you have any appre...
No comments:
Post a Comment